BAYSIDE BEACH DOCK INSTALLATION/MOORING INFO:
Floating docks will be installed this Friday, April 23, 2021, starting at 4PM, weather permitting.
Bayside Beach members who want to put their boats in their assigned mooring slips as soon this weekend (April 24 – April 25) should check the bulletin board by the bathrooms at the beach in order to see their 2021 mooring slip assignments.
Due to circumstances beyond our control, the opening day newsletter with mooring documents will not be mailed out until this weekend.
Thank you,
Cathy Schroeder.